An ACP-7 Form is valid for one year from the original date of filing. When the work to be performed constitutes an asbestos project, the building owner or authorized agent must submit an asbestos project notification (ACP-7 Form) in ARTS at least one week in advance of the start of the work along with the associated filing fee (refer to 15 RCNY § 1-25). Download the Statement of Agreement for Filing Paperless ACP-5 FormsĪsbestos Project Notification (ACP-7 Form)Īn asbestos project is defined as any form of work that will disturb more than 25 linear feet or more than 10 square feet of asbestos-containing material.Once the form is accepted, we will notify you via email and provide a temporary password with the link where you will electronically file your ACP-5 Form. The form can either be mailed or hand delivered. If you are an employee of a company that has a New York State Department of Labor Asbestos Handling License number, you will be required to submit a letter of authorization from the company together with your forms. The Statement of Agreement for filing ACP-5 Forms must have original signatures, dates and seal. The only exceptions are a concurrent demolition and Abestos Technical Review Unit (A-TRU) permitted project, immediate emergency demolition, or emergency demolition. The Asbestos Project Completion (ACP-21 Form) or Asbestos Project Conditional Completion (ACP-20 Form) will not be accepted as the basis for issuing a full building demolition permit. The Department of Buildings (DOB) will only issue a full demolition permit based on an Asbestos Assessment Report (ACP-5 Form) issued by a DEP-certified asbestos investigator with box 8d checked (which indicates that the entire building is free of asbestos containing material). If the investigator determines that the building (or portion thereof) affected by the work is free ACM, the ACM present will not be disturbed by the work, or the amount of ACM to be abated constitutes a minor project, they must complete, sign, and seal an Asbestos Assessment Report (ACP-5 Form) and submit it to DEP in accordance with 15 RCNY § 1-22(b)(1) (refer to 15 RCNY § 1-23(b)(1–3) for a list of exempt activities). Building owners are responsible for having a DEP-certified asbestos investigator perform an asbestos survey to determine if asbestos-containing material (ACM) will be disturbed during the course of work on their building.
0 Comments
Leave a Reply. |